THE OPTIMIZATION CHALLENGE

Grade Sequence Optimization in manufacturing

Apex Case Study: Petrochemical

The Problem

A major petrochemical company was suffering from high set-up costs and inefficient production due to sub-optimal scheduling.

Our Solution

We applied advanced modeling to develop a profitable demand plan and an optimal transition sequence for manufacturing.

The Result

Minimal set-up costs, a significant reduction in off-spec production, and a major boost to efficiency and profitability.

Grade A B C D
A 0 Tab Tac Tad
B Tba 0 R Tbd
C Tca Tcb 0 Tcd
D R Tdb R 0

The same scheduling logic applies wherever changeovers, line setups, grade transitions, packaging formats, and capacity constraints affect throughput.

Let’s talk

Discuss your SAP challenge with our experts.

Ask Lydian All case studies